- Civil & Cyber Infrastructure Resilience: Cross-Document Synthesis, Dependency Matrix & Stakeholder Reading Paths
- 1. Master Executive Briefing Synthesis
- 2. Complete Document Dependency Matrix
- 3. Role-Based Stakeholder Reading Guides
- 4. Master Feature Traceability Crosswalk
- 5. Master Regulatory, Standards & Protocol Cross-Reference
- 6. Actionable Stakeholder Calls to Action (CTAs)
- Supplement (added after initial bundle)
RESILIENCE-MESH: Executive Master Index & Navigational Guide
Civil & Cyber Infrastructure Resilience: Cross-Document Synthesis, Dependency Matrix & Stakeholder Reading Paths
Document Identifier: RM-IDX-2026-V1
Classification: OFFICIAL — PUBLIC RELEASE
Jurisdiction: Western Australia & Commonwealth of Australia
Status: Authoritative Repository Navigation Engine
1. Master Executive Briefing Synthesis
The RESILIENCE-MESH proposal bundle establishes a comprehensive, legally compliant, and hydraulically validated cyber-physical infrastructure framework designed to safeguard Western Australia's water and energy distribution lifelines against compounding climate extremes and asymmetric cyber vulnerabilities.
┌──────────────────────────────────────────────────────────────────────────────────┐
│ RESILIENCE-MESH SYSTEM TOPOLOGY │
├──────────────────────────────────────────────────────────────────────────────────┤
│ UTILITY CORE │
│ [Water Corporation / DWER / Council Dispatch] <── FIPS 140-3 HSM Root of Trust │
│ │ │
│ Signed Leases ▼ Telemetry Uplink │
│ (mTLS / Ed25519 / CBOR / JSON) │
├──────────────────────────────────────────────────────────────────────────────────┤
│ CUSTOMER BOUNDARY GATEWAY │
│ [Secure Element] ──> Local Policy Arbiter ──> Deterministic HMAC Dither Engine │
│ │ │
├──────────────────────────────┼───────────────────────────────────────────────────┤
│ POTABLE DOMESTIC LINE │ DEDICATED IRRIGATION BRANCH │
│ (100% Full-Bore / Safe) │ (Controlled & Protected) │
│ │ │
│ • Drinking Water & Kitchen │ [AS/NZS 2845.1 RPZD Backflow Assembly] │
│ • Showers & Sanitation │ │ │
│ • Medical Dialysis Lines │ [Yellow Quarter-Turn Manual Bypass Ball Valve] │
│ • Bushfire APZ Hose Reels │ │ │
│ │ [Normally-Open Bi-Stable Motorized Valve] │
│ (NO ACTUATORS PERMITTED) │ │ │
│ │ [Garden Sprinklers & Turf Micro-Drippers] │
└──────────────────────────────┴───────────────────────────────────────────────────┘
Core Program Theses:
- The Infrastructure Asymmetry Problem: Physical water and power grids have been connected to commoditized, cloud-tethered IoT devices without adequate security boundaries. A low-capability threat actor exploiting a single shared cloud broker could issue synchronized shutoff commands, inducing constructive fluid shockwaves (Joukowsky water hammer: $\Delta P = \rho c \Delta v$) that shatter municipal distribution mains or trigger distribution feeder electrical trips (RoCoF $>0.5 \text{ Hz/s}$).
- The Climate Imperative: With the Bureau of Meteorology (BoM) confirming an intensifying 2026 El Niño Southern Oscillation (ENSO) and positive Indian Ocean Dipole (IOD), peak summer water demand in Perth-Mandurah (driven 45–50% by residential sprinklers) threatens elevated reservoirs and Gnangara groundwater levels.
- The Lawful Separation Principle: Rather than unconstitutionally throttling entire household water services (violating Water Services Act 2012 s. 95(3)), RESILIENCE-MESH strictly targets the dedicated outdoor irrigation branch, exercising lawful waste-prevention powers under s. 95(2) while providing an ironclad guarantee that drinking water, sanitation, and medical life-support are never touched.
- Deterministic Anti-Synchronization: Mathematical HMAC-SHA256 dither ($W = 900 \text{ s}$) smooths fleet valve actuations across 15 minutes, completely eliminating acoustic wave superposition and distribution main bursts.
- A Turnkey $2.25M AUD Staged Pipeline: A structured, 18-month commercial path (Phase 0 Lab Rig $250k, Phase 1 50-Site Pilot $650k, Phase 2 500-Site DMA Demonstration $1.35M) with 10 quantifiable KPIs and an open-standard IP model.
2. Complete Document Dependency Matrix
The RESILIENCE-MESH deliverable bundle is organized into four interconnected functional layers. The matrix below defines the explicit upstream and downstream dependencies across all deliverables:
┌──────────────────────────────────────────────────────────────────────────────────┐
│ DELIVERABLE DEPENDENCY MAP │
├──────────────────────────────────────────────────────────────────────────────────┤
│ LAYER 1: STRATEGIC & POLICY (M1) │
│ [01_EXECUTIVE_CONCEPT_BRIEF] ──> [02_IRRIGATION_PILOT] ──> [03_SAFETY_RIGHTS] │
│ │ │ │ │
│ └─────────────────────────────┼────────────────────────┘ │
│ ▼ │
│ LAYER 2: TECHNICAL & THREAT (M2) │
│ [04_TECHNICAL_INTEROPERABILITY_PROFILE] <───> [05_CYBER_AND_SUPPLY_CHAIN_THREAT] │
│ │ │ │
│ └──────────────────────┬───────────────────────┘ │
│ ▼ │
│ LAYER 3: PROCUREMENT & OUTREACH (M3) │
│ [06_FEASIBILITY_CONTRACT_REQUEST] ──────> [07_COVER_LETTERS/ (4 Stakeholders)] │
│ │ │ │
│ └──────────────────────┬───────────────────────┘ │
│ ▼ │
│ LAYER 4: NAVIGATION & GOVERNANCE │
│ [README.md] <───────────────────────────────────────────> [INDEX.md] │
└──────────────────────────────────────────────────────────────────────────────────┘
Formal Cross-Document Interface Contracts:
| Interface Boundary | Connecting Documents | Enforced Interface Contract & Shared Invariants |
|---|---|---|
| Policy ↔ Technical | 02_IRRIGATION_PILOT ↔ 04_TECHNICAL_PROFILE |
Command tokens (PAUSE_SCHEDULE, CAP_FLOW_RATE, ENFORCE_WINDOW, RESUME_SCHEDULE, EMERGENCY_RELEASE) in policy match technical enum tokens exactly. The 72-hour maximum lease limit matches the schema constraint (max_ttl_seconds = 259200). |
| Safety ↔ Threat Model | 03_SAFETY_RIGHTS ↔ 05_CYBER_THREAT_MODEL |
The yellow quarter-turn manual bypass valve and normally-open failsafe are validated against grid outage and physical tamper threat trees. Flow signature separation (leak vs. schedule) matches anomaly detection logic. |
| Technical ↔ Threat Model | 04_TECHNICAL_PROFILE ↔ 05_CYBER_THREAT_MODEL |
Anti-replay parameters (64-bit monotonic counter, UTC drift window max $\pm 120 \text{ s}$) are identical across JSON/CBOR schemas and attack tree mitigations. Joukowsky slew-rate ($dv/dt \le 0.05 \text{ m/s}^2$) and HMAC dither formula match. |
| Deliverables ↔ Procurement | 01..05 ↔ 06_FEASIBILITY_CONTRACT |
Pilot phases (Phase 0 $250k, Phase 1 $650k, Phase 2 $1.35M; total $2.25M AUD), 10 KPIs, and 8-point risk register directly budget and operationalize the technical and legal requirements of documents 01–05. |
| Outreach ↔ Procurement | 06_FEASIBILITY_CONTRACT ↔ 07_COVER_LETTERS/ |
The 4 stakeholder cover letters reference exact budget allocations, pilot phases, and governance seats established in the feasibility contract request. |
3. Role-Based Stakeholder Reading Guides
To facilitate efficient executive review, stakeholders should follow the reading sequences tailored to their statutory mandates and institutional priorities:
┌──────────────────────────────────────────────────────────────────────────────────┐
│ STAKEHOLDER READING PATHWAYS │
├───────────────────────────────┬──────────────────────────────────────────────────┤
│ Stakeholder Persona │ Recommended Sequential Reading Order │
├───────────────────────────────┼──────────────────────────────────────────────────┤
│ 1. Water Utility Leadership │ 07_COVER_LETTERS/WATER_UTILITIES.md ──> │
│ (Water Corp, DWER, ERA) │ 01_EXECUTIVE_CONCEPT_BRIEF.md ──> │
│ │ 06_FEASIBILITY_CONTRACT_REQUEST.md ──> │
│ │ 02_IRRIGATION_MANAGEMENT_PILOT.md ──> │
│ │ 05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md │
├───────────────────────────────┼──────────────────────────────────────────────────┤
│ 2. Local Council Executives │ 07_COVER_LETTERS/LOCAL_COUNCILS.md ──> │
│ (Mayors, CEOs, WALGA) │ 01_EXECUTIVE_CONCEPT_BRIEF.md ──> │
│ │ 03_SAFETY_AND_RIGHTS_FRAMEWORK.md ──> │
│ │ 02_IRRIGATION_MANAGEMENT_PILOT.md ──> │
│ │ 06_FEASIBILITY_CONTRACT_REQUEST.md │
├───────────────────────────────┼──────────────────────────────────────────────────┤
│ 3. Emergency Management & Fire│ 07_COVER_LETTERS/EMERGENCY_MANAGEMENT.md ──> │
│ (DFES, SEMC, NEMA) │ 03_SAFETY_AND_RIGHTS_FRAMEWORK.md (Fire APZ) ──> │
│ │ 05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md ──> │
│ │ 06_FEASIBILITY_CONTRACT_REQUEST.md │
├───────────────────────────────┼──────────────────────────────────────────────────┤
│ 4. Cyber Architects & CISOs │ 05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md ──> │
│ (ACSC, Vendor OEMs, CISOs) │ 04_TECHNICAL_INTEROPERABILITY_PROFILE.md ──> │
│ │ 06_FEASIBILITY_CONTRACT_REQUEST.md (Risk Reg) │
├───────────────────────────────┼──────────────────────────────────────────────────┤
│ 5. Academic & Research PIs │ 07_COVER_LETTERS/ACADEMIC_RESEARCH.md ──> │
│ (UWA, Curtin, Data61, ARC) │ 05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md ──> │
│ │ 04_TECHNICAL_INTEROPERABILITY_PROFILE.md ──> │
│ │ 06_FEASIBILITY_CONTRACT_REQUEST.md (Phase 0 HIL) │
└───────────────────────────────┴──────────────────────────────────────────────────┘
Detailed Persona Reading Summaries:
Reading Guide 1: Water Utility Executives & Regulators (Water Corporation, DWER, ERA)
- Primary Focus: Network pressure management, peak summer demand shaving, deferring desalination CAPEX, and statutory compliance.
- Critical Reading Sections:
1.
07_COVER_LETTERS/WATER_UTILITIES.md: Executive proposition and virtual reservoir capacity. 2.01_EXECUTIVE_CONCEPT_BRIEF.md: Problem statement, El Niño climate risks, and statutory alignment with the Water Services Act 2012. 3.06_FEASIBILITY_CONTRACT_REQUEST.md: Section 3 (Budget) and Section 4 (KPI-02 breach reduction, KPI-03 peak shaving). 4.05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md: Section 3 (Joukowsky water hammer analysis and hydraulic transient mitigation).
Reading Guide 2: Local Government Mayors, CEOs & Parks Directors (WALGA, LGAs)
- Primary Focus: Ratepayer goodwill, eliminating confrontational ranger patrols, protecting sports turf and street tree canopy, and tenant equity.
- Critical Reading Sections:
1.
07_COVER_LETTERS/LOCAL_COUNCILS.md: Municipal value architecture, zero-cost Phase 1 hosting, and ratepayer protection. 2.03_SAFETY_AND_RIGHTS_FRAMEWORK.md: Section 2 (Split tenant/landlord liability) and Section 3 (Graduated 4-tier due process). 3.02_IRRIGATION_MANAGEMENT_PILOT.md: Section 2 (25 Public Open Space trial sites).
Reading Guide 3: Emergency Management & Civil Defence (DFES, SEMC, NEMA)
- Primary Focus: Preservation of town water pressure for fire hydrants on Catastrophic Fire Danger days, frontline firefighter safety, and Asset Protection Zone (APZ) water security.
- Critical Reading Sections:
1.
07_COVER_LETTERS/EMERGENCY_MANAGEMENT.md: Inter-agency civil defence proposal and EPR preemption. 2.03_SAFETY_AND_RIGHTS_FRAMEWORK.md: Section 3.3 (EX-FIRbushfire exemption) and Section 4 (Mechanical manual bypass valve). 3.05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md: Section 4.4 (Emergency Priority Release execution in $<2.0 \text{ s}$).
Reading Guide 4: Cyber Security Officers, Systems Architects & IoT OEMs
- Primary Focus: SOCI Act CIRMP compliance, ACSC Essential Eight Maturity Level 3, asymmetric PKI, anti-replay, and multi-transport payload serialization.
- Critical Reading Sections:
1.
05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md: STRIDE analysis across 5 surfaces, formal attack trees, and 4-state lease state machine. 2.04_TECHNICAL_INTEROPERABILITY_PROFILE.md: RFC 8785 Canonical JSON (Profile J), RFC 8949 Compact CBOR (Profile C), and Ed25519 PKI. 3.06_FEASIBILITY_CONTRACT_REQUEST.md: Section 5 (Comprehensive 8-point risk register).
Reading Guide 5: Academic Researchers, Testbed Directors & Grant Investigators
- Primary Focus: Hardware-in-the-Loop testbeds, fluid-acoustic shockwave modeling, coupled water-energy transient co-simulation, and ARC Linkage / CRC-P grants.
- Critical Reading Sections:
1.
07_COVER_LETTERS/ACADEMIC_RESEARCH.md: Research pillars, journal publication targets, and living lab opportunities. 2.06_FEASIBILITY_CONTRACT_REQUEST.md: Section 2.1 (Phase 0 $250k AUD testbed rig specifications). 3.05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md: Mathematical derivations of fluid wave speeds and deterministic HMAC dither.
4. Master Feature Traceability Crosswalk
Every core architectural capability identified during the program definition phase is mapped directly to its definitive authored deliverable and section:
| Feature Code | Feature Description | Primary Deliverable | Section Reference |
|---|---|---|---|
| F-POL-01 | Infrastructure Asymmetry Problem Formulation & Threat Framing | 01_EXECUTIVE_CONCEPT_BRIEF.md |
Section 1 & 2 |
| F-POL-02 | BoM ENSO/El Niño, IOD & SAM 2026 Climate Risk Analysis | 01_EXECUTIVE_CONCEPT_BRIEF.md |
Section 2 |
| F-POL-03 | Dual Cyber-Physical Framework (Preventing Panic Interventions) | 01_EXECUTIVE_CONCEPT_BRIEF.md |
Section 3 |
| F-POL-04 | Statutory Alignment: Water Services Act 2012 ss. 95(2) & 95(3) | 03_SAFETY_AND_RIGHTS_FRAMEWORK.md |
Section 1.1 |
| F-POL-05 | Regulatory Alignment: Water Agencies (Water Use) By-laws 2010 | 02_IRRIGATION_MANAGEMENT_PILOT.md |
Section 1.2 |
| F-POL-06 | DWER Rights in Water and Irrigation Act 1914 Garden Bore Rules | 02_IRRIGATION_MANAGEMENT_PILOT.md |
Section 1.3 |
| F-POL-07 | 4-Stage Proactive Preparedness Framework & Trigger Thresholds | 01_EXECUTIVE_CONCEPT_BRIEF.md |
Section 4 |
| F-POL-08 | Tiered Due Process (Tier 0 Advisory to Tier 3 Reversible Capping) | 03_SAFETY_AND_RIGHTS_FRAMEWORK.md |
Section 3 |
| F-POL-09 | Landlord vs. Tenant Liability Distinction (RTA 1987 ss. 42 & 47) | 03_SAFETY_AND_RIGHTS_FRAMEWORK.md |
Section 2 |
| F-POL-10 | Absolute Potable / Sanitary / Medical / Fire APZ Water Immunity | 03_SAFETY_AND_RIGHTS_FRAMEWORK.md |
Section 1.2 |
| F-POL-11 | Formal Exemption Registry & Codes (EX-DIS, EX-FIR, EX-TRF, etc.) |
03_SAFETY_AND_RIGHTS_FRAMEWORK.md |
Section 3.3 |
| F-POL-12 | 72h Max Capping Lease & Autonomous Fail-Safe Watchdogs | 03_SAFETY_AND_RIGHTS_FRAMEWORK.md |
Section 4 |
| F-POL-13 | Physical Manual Override (Yellow Quarter-Turn Ball Valve Bypass) | 03_SAFETY_AND_RIGHTS_FRAMEWORK.md |
Section 4.2 |
| F-TEC-01 | Edge Hardware Topologies (Type A, B, C, D) Matrix & Schematics | 04_TECHNICAL_INTEROPERABILITY_PROFILE.md |
Section 2 |
| F-TEC-02 | Multi-Physical Layer Profiling (Cellular, LoRaWAN, BLE, Wi-Fi) | 04_TECHNICAL_INTEROPERABILITY_PROFILE.md |
Section 3 |
| F-TEC-03 | Profile J: Canonical JSON (RFC 8785) & JSON Schema (Draft 2020-12) | 04_TECHNICAL_INTEROPERABILITY_PROFILE.md |
Section 4.1 |
| F-TEC-04 | Profile C: Compact CBOR (RFC 8949) & CDDL (RFC 8610) for LoRaWAN | 04_TECHNICAL_INTEROPERABILITY_PROFILE.md |
Section 4.2 |
| F-TEC-05 | 3-Tier Asymmetric PKI Architecture (Ed25519 & ECDSA P-256) | 04_TECHNICAL_INTEROPERABILITY_PROFILE.md |
Section 5 |
| F-TEC-06 | Anti-Replay Architecture (64-bit Monotonic Counter, Nonce, TTL) | 04_TECHNICAL_INTEROPERABILITY_PROFILE.md |
Section 5.3 |
| F-TEC-07 | 5-Part Command Taxonomy & Priority Preemption Hierarchy | 04_TECHNICAL_INTEROPERABILITY_PROFILE.md |
Section 6 |
| F-TEC-08 | Bidirectional Signed Receipts (ACK/NACK) & Tamper Bitmasks | 04_TECHNICAL_INTEROPERABILITY_PROFILE.md |
Section 7 |
| F-TEC-09 | Push-Notification & Zero Open Inbound Listening Port Design | 04_TECHNICAL_INTEROPERABILITY_PROFILE.md |
Section 8 |
| F-SEC-01 | STRIDE Cyber Threat Matrix Across 5 Surface Layers | 05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md |
Section 2.1 |
| F-SEC-02 | Attack Tree Formalisms (Cascading, Key Theft, Firmware Hijack) | 05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md |
Section 2.2 |
| F-SEC-03 | Joukowsky Water Hammer Analysis ($\Delta P = \rho c \Delta v$) | 05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md |
Section 3.1 |
| F-SEC-04 | Deterministic Cryptographic Dither to Prevent Grid/Water Spikes | 05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md |
Section 3.3 |
| F-SEC-05 | Hardware Trust Domain Separation (AS/NZS 3500.1 Isolation) | 05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md |
Section 4.1 |
| F-SEC-06 | 4-State Cryptographic Lease State Machine & Auto-Restoration | 05_CYBER_AND_SUPPLY_CHAIN_THREAT_MODEL.md |
Section 4.4 |
| F-PRO-01 | 3-Phase Staged Feasibility Study Architecture ($2.25M AUD Budget) | 06_FEASIBILITY_CONTRACT_REQUEST.md |
Section 2 & 3 |
| F-PRO-02 | Pilot Evaluation Matrix & 10 Quantifiable Key Performance Indicators | 06_FEASIBILITY_CONTRACT_REQUEST.md |
Section 4 |
| F-PRO-03 | 8-Point Comprehensive Risk Register & Mitigation Strategy | 06_FEASIBILITY_CONTRACT_REQUEST.md |
Section 5 |
| F-PRO-04 | Tailored Cover Letter: Local Government Authorities / Councils | 07_COVER_LETTERS/LOCAL_COUNCILS.md |
Full Document |
| F-PRO-05 | Tailored Cover Letter: Water Utilities (Water Corp / DWER) | 07_COVER_LETTERS/WATER_UTILITIES.md |
Full Document |
| F-PRO-06 | Tailored Cover Letter: Academic & Research Institutions | 07_COVER_LETTERS/ACADEMIC_RESEARCH.md |
Full Document |
| F-PRO-07 | Tailored Cover Letter: Emergency Management & Civil Defence | 07_COVER_LETTERS/EMERGENCY_MANAGEMENT.md |
Full Document |
| F-PRO-08 | Master Navigable Table of Contents & Executive Index | README.md & INDEX.md |
Full Documents |
5. Master Regulatory, Standards & Protocol Cross-Reference
| Code / Standard | Title / Description | Applicability to RESILIENCE-MESH |
|---|---|---|
| WSA 2012 | Water Services Act 2012 (WA) | Primary statutory authority for water licensing, flow reduction (s. 95(2)), and occupied dwelling protection (s. 95(3)). |
| WAWUB 2010 | Water Agencies (Water Use) By-laws 2010 (WA) | Governs the 2-day sprinkler roster, daytime watering bans, and $100 modified infringement penalties. |
| RIWI 1914 | Rights in Water and Irrigation Act 1914 (WA) | Governs groundwater abstraction, domestic garden bore regulation, and DWER licensing powers. |
| RTA 1987 | Residential Tenancies Act 1987 (WA) | Governs lessor repair obligations (s. 42) and water consumption cost boundaries (s. 47). |
| BFA 1954 | Bush Fires Act 1954 (WA) | Governs firebreaks, Asset Protection Zones (APZ), and emergency overrides during Total Fire Bans. |
| SOCI 2018 | Security of Critical Infrastructure Act 2018 (Cth) | Mandates Critical Infrastructure Risk Management Programs (CIRMP) for the water, energy, and data sectors. |
| AS/NZS 3500.1 | Plumbing and Drainage - Water Services | Mandates physical separation, pipe sizing, and backflow isolation on dedicated irrigation lines. |
| AS/NZS 2845.1 | Water Supply - Backflow Prevention Devices | Mandates Reduced Pressure Zone Devices (RPZD) upstream of chemical or non-potable irrigation systems. |
| RFC 8785 | JSON Canonicalization Scheme (JCS) | Formats canonical JSON payloads (Profile J) for deterministic cryptographic signing across cloud APIs. |
| RFC 8949 | Concise Binary Object Representation (CBOR) | Compresses signed payloads (Profile C) into $<48$ bytes for LPWAN (LoRaWAN AU915) radio transmission. |
| RFC 8032 | Edwards-Curve Digital Signature Algorithm (EdDSA) | Defines the high-performance Ed25519 digital signature algorithm implemented on edge microcontrollers. |
| RFC 9052/9053 | CBOR Object Signing and Encryption (COSE) | Defines COSE_Sign1 framing used for secure, signed compact edge message delivery. |
| FIPS 140-3 | Security Requirements for Cryptographic Modules | Governs Level 3 Hardware Security Modules (HSMs) protecting utility root signing keys. |
6. Actionable Stakeholder Calls to Action (CTAs)
┌──────────────────────────────────────────────────────────────────────────────────┐
│ STAKEHOLDER ACTION CALLS │
├───────────────────────┬──────────────────────────────────────────────────────────┤
│ Stakeholder │ Immediate Recommended Action │
├───────────────────────┼──────────────────────────────────────────────────────────┤
│ Water Corporation │ Convene executive review to co-sponsor Phase 0 & Phase 1;│
│ & DWER │ designate steering committee members (Ref: RM-LTR-UTL). │
├───────────────────────┼──────────────────────────────────────────────────────────┤
│ Local Councils │ Submit Expression of Interest to host Phase 1 trial │
│ (LGAs / WALGA) │ across 25 municipal parks and verges (Ref: RM-LTR-LGA). │
├───────────────────────┼──────────────────────────────────────────────────────────┤
│ Academic Institutions │ Partner on Phase 0 HIL acoustic testbed and submit joint │
│ (UWA / Curtin / CSIRO)│ ARC Linkage project grant application (Ref: RM-LTR-ACA). │
├───────────────────────┼──────────────────────────────────────────────────────────┤
│ Emergency Services │ Review and formally ratify the Emergency Priority Release│
│ (DFES / SEMC / NEMA) │ (EPR) preemption protocol (Ref: RM-LTR-EMG). │
└───────────────────────┴──────────────────────────────────────────────────────────┘
For general project governance inquiries, consortium coordination, or to obtain official signed copies of this proposal bundle, contact:
The RESILIENCE-MESH Project Steering Group
Email: governance@resilience-mesh.org
Web: https://resilience-mesh.org
Perth, Western Australia
Supplement (added after initial bundle)
- 08_ADAPTIVE_TESTING_AND_BIDIRECTIONAL_CRISIS_MODES.md: device characterisation programme, staged testing bounds (S0-S5), bidirectional crisis modes (restrict in drought/grid stress, selective wet-down in bushfire), and solar/battery interaction. Draft, not yet audited.